6. Pipeline transportation
Pipeline transportation
1. Equipment, machines and tools and personnel are on standby in the company. In case of emergency, they shall receive the notice of the owner and arrive at the scene of the accident within the specified time to carry out the repair work.
2, on standby at the construction site, after receiving the notice to arrive near the designated location. If the owner gets stuck in the ball during the ball passing process, which affects the normal transportation of the medium, the emergency rescue work can be quickly put into operation.
3. The machines and tools are on standby at the site, and the personnel are on standby at the company. After receiving the notice, they will arrive at the designated place within the specified time for emergency rescue work.
Pipeline maintenance and repair
1. Cutting without fire 2. Pipeline container without fire and without shutdown, rapid leakage stoppage with pressure
Previous Page
Next Page
Previous Page
Next Page
Contact Information
E-mail:
Mobile:
Address:
Beijing Changping District Beijing Jinshiwan Pipeline Technology Co., Ltd.
COPYRIGHT©2024 Beijing Jinshiwan Pipeline Technology Co., Ltd.