Service advantages


Security:
1. Disclosure of operation contents and risk analysis
2. Risk control point security measures
3. Analysis and inspection of equipment running status
4. Tool vehicle safety inspection
5. Standard operation of personnel

• Construction operations, safety analysis, development of measures and risk mitigation
• Safety plan, special preparation, emergency plan and real landing
• Safety management, years of experience, strict assessment, qualified posts
• Safety inspection, joint guarantee, full commitment and standardized operation

  • BIGGER
    Safety and security
    1. Disclosure of homework content and risk analysis
    2. Security measures for risk control points
    3. Analysis and inspection of equipment operation status
    4. Tool vehicle safety inspection
    5. Personnel standard standard operation
    -----------
    1. Construction work, safety analysis, formulation of measures, and risk reduction
    2. Safety plan, special preparation, emergency plan, and real implementation
    3. Safety management, many years of experience, strict assessment, qualified post
    4. Safety inspection, joint guarantee, full commitment, and standardized operation
  • BIGGER
    Quality Assurance
    1. Formulate strict management rules and regulations
    2. Quality control point analysis
    3. The ability of management personnel is up to standard
    4. The skills of the operators are up to standard
    5. Experience summary before and after class
    -----------
    1. Construction plan, preparation according to reality, operating procedures, standards and specifications
    2. Construction personnel, many years of experience, special projects, complete certificates
    3. High-voltage equipment, regular maintenance, instrumentation, and special management
    4. Key nodes, special personnel are responsible, quality inspection, and evidence-based
  • 冷库生鲜仓储
    Personnel security
    8 constructors; 4 senior engineers;
    2 intermediate engineers; 10 assistant engineers;
    6 safety production managers; 18 safety officers;
    40 plugging workers; 30 welders;
    10 lifting workers; 4 soopers; 12 electricians;
    -----------
    1. The personnel have a nationally recognized professional certificate
    2. Personnel have more than 10 years of construction experience
    3. Personnel have honorary certificates
    4. Personnel have safety education
  • BIGGER
    Equipment Guarantee
    There are 136 hole opening machines, 150 plugging devices, 189 splint valves, 117 plugging devices, 120 hydraulic stations, and other sufficient supporting equipment, with a total investment of 150 million.
    -----------
    1. The equipment is in good operation and guaranteed
    2. The equipment is inspected. Maintenance records
    3. The equipment has a special certificate
    4. The equipment has sufficient spare parts