Sun Jiaran
Title: Director of Project Management Department
Construction experience: 12 years
Certificate: quality manager certificate, project manager certificate
Construction experience: 12 years
Certificate: quality manager certificate, project manager certificate
1. Renovation Project of Jinmin Product Oil Pipeline Valve Chamber of Shanghai Petroleum Branch of Sinopec Sales Co., Ltd.
2. Blocking Project of Luoyang Outbound Station of Luozheng Oil Product Pipeline and Cross Section of National Highway G207 Provincial Highway S539
3. Sealing of Safety Hazard Remediation Project of Xisha River Crossing Pipeline in the East of Weifang
4. Line Change Project at 251KM 931M of Shandong-Anhui Phase II East Line
5. Changling-Zhuzhou Oil Product Pipeline Xiangjiang River Crossing Section Rerouting Project
2. Blocking Project of Luoyang Outbound Station of Luozheng Oil Product Pipeline and Cross Section of National Highway G207 Provincial Highway S539
3. Sealing of Safety Hazard Remediation Project of Xisha River Crossing Pipeline in the East of Weifang
4. Line Change Project at 251KM 931M of Shandong-Anhui Phase II East Line
5. Changling-Zhuzhou Oil Product Pipeline Xiangjiang River Crossing Section Rerouting Project

Wu Haichao
Title: Project Manager
Construction experience: 10 years
Certificate: Grade II constructor certificate, Beijing Jian 'an B certificate
Construction experience: 10 years
Certificate: Grade II constructor certificate, Beijing Jian 'an B certificate
1. CNOOC Gas Pipeline Plugging Construction Project under Pressure
2. Blocking Project of Shenzhen Buban Pipeline Relocation Project of Sinopec South China Oil Transportation Department
3. Relocation Project of Zhenhai-Hangzhou Oil Product Pipeline in Yuyao, Shaoxing and Xiaoshan Sections
4. Huzhou gas Qingling highway sub-high pressure pipeline non-stop transmission opening and plugging additional valve project
5. Luoxi Pipeline Zhengzhou Station Inbound 14KM 920M Crossing Dry River Hidden Danger Treatment Public Pipeline Blocking
2. Blocking Project of Shenzhen Buban Pipeline Relocation Project of Sinopec South China Oil Transportation Department
3. Relocation Project of Zhenhai-Hangzhou Oil Product Pipeline in Yuyao, Shaoxing and Xiaoshan Sections
4. Huzhou gas Qingling highway sub-high pressure pipeline non-stop transmission opening and plugging additional valve project
5. Luoxi Pipeline Zhengzhou Station Inbound 14KM 920M Crossing Dry River Hidden Danger Treatment Public Pipeline Blocking

Shao Mingyang
Title: Project Manager
Construction experience: 12 years
Certificate: project manager certificate, assistant engineer certificate
Construction experience: 12 years
Certificate: project manager certificate, assistant engineer certificate
1. Relocation Project of Gas Transmission Pipeline at Crossover Section of Jiangxi Branch Line of Sichuan-East Gas Transmission and Anjiu Tiekonglongbei Station
2. Wuhua Petrochemical Relocation Project Future City Section Non-stop Blocking Construction
3. Pressure Plugging Project of Jianghan East China Project Department
4. Guangxi Oil Transmission Part I Yulin Second Ring Road West Line Change Project
5. Nanning Oil Transmission Management Office Yulin Second Ring South Line Change Project Blocking Construction with Pressure
2. Wuhua Petrochemical Relocation Project Future City Section Non-stop Blocking Construction
3. Pressure Plugging Project of Jianghan East China Project Department
4. Guangxi Oil Transmission Part I Yulin Second Ring Road West Line Change Project
5. Nanning Oil Transmission Management Office Yulin Second Ring South Line Change Project Blocking Construction with Pressure

Wang Dawei
Title: Project Manager
Construction experience: 11 years
Certificate: project manager certificate, full-time safety officer certificate
Construction experience: 11 years
Certificate: project manager certificate, full-time safety officer certificate
1. Ronglai high-speed railway high-pressure pipeline rerouting (Xiaoguan section) non-stop transmission with pressure hole plugging project
2. Laiyang Kunlun Risheng DN400 Natural Gas Pipeline Construction with Pressure Opening Project
3. New North Henan LNG Emergency Reserve Center Zhanduanbo Line Realignment Project
4. Shiguai Kodak Chemical High and Medium Pressure Gas Pipeline High Pressure Opening Project
5. Commissioning Contract for Construction Technical Service of Ring Welding Defect Remediation Project of Zhanbei Pipeline Crossing Lizhan Railway
6. New Town Realignment Project in the South of Tianjin Reserve Reservoir from Nanjiang to Xinhe Pipeline
2. Laiyang Kunlun Risheng DN400 Natural Gas Pipeline Construction with Pressure Opening Project
3. New North Henan LNG Emergency Reserve Center Zhanduanbo Line Realignment Project
4. Shiguai Kodak Chemical High and Medium Pressure Gas Pipeline High Pressure Opening Project
5. Commissioning Contract for Construction Technical Service of Ring Welding Defect Remediation Project of Zhanbei Pipeline Crossing Lizhan Railway
6. New Town Realignment Project in the South of Tianjin Reserve Reservoir from Nanjiang to Xinhe Pipeline

Li Chao
Title: Minister of Engineering
Construction experience: 10 years
Certificate: full-time safety officer certificate, safety production management certificate
Construction experience: 10 years
Certificate: full-time safety officer certificate, safety production management certificate
1. Pressure Sealing Project of Yuyao, Shaoxing and Xiaoshan Sections of Zhenhai-Hangzhou Oil Product Pipeline to New City Section of High-speed Railway
2. Zhengzhou South Fourth Ring Road 355 Oil Pipeline Blocking and Rerouting Project under Pressure
3. Tangyan Double Line and Jingxiong Railway Crossing and Realignment Project
4. Luozheng Oil Pipeline in Zhengzhou Fourth Ring Road and Dahe Road Expressway Pipeline Relocation Project
5. Sealing Project of Product Oil Pipeline in Jinan Oil Transportation Department
2. Zhengzhou South Fourth Ring Road 355 Oil Pipeline Blocking and Rerouting Project under Pressure
3. Tangyan Double Line and Jingxiong Railway Crossing and Realignment Project
4. Luozheng Oil Pipeline in Zhengzhou Fourth Ring Road and Dahe Road Expressway Pipeline Relocation Project
5. Sealing Project of Product Oil Pipeline in Jinan Oil Transportation Department

Dong Xiaojin
Position: Minister of Installation Department
Construction experience: 9 years
Certificate: assistant engineer certificate, safety production management certificate
Construction experience: 9 years
Certificate: assistant engineer certificate, safety production management certificate
1. Blocking Construction of Bid 1 of West Kiln Water Source Section of Shitai Product Oil Pipeline
2. Sinopec Beilun Section Petrochemical Pipeline Hidden Danger Rectification Local Relocation Project
3. Pearl River Delta Product Oil Pipeline Heshan-Jiangmen Section Site Mountain Service Area Occupation and Relocation Project
4. Wuhan Oil Depot-Wuhan Tianhe Airport Aviation Coal Pipeline Hidden Trouble Finding and Emergency Repair Construction
5. Blockage and Realignment Project of Yongning Line in Large Cultural Tourism Project of Nanjing Development Zone
2. Sinopec Beilun Section Petrochemical Pipeline Hidden Danger Rectification Local Relocation Project
3. Pearl River Delta Product Oil Pipeline Heshan-Jiangmen Section Site Mountain Service Area Occupation and Relocation Project
4. Wuhan Oil Depot-Wuhan Tianhe Airport Aviation Coal Pipeline Hidden Trouble Finding and Emergency Repair Construction
5. Blockage and Realignment Project of Yongning Line in Large Cultural Tourism Project of Nanjing Development Zone