On September 26, 2023, a semi-trailer full of blocking equipment slowly left the operation site, marking the smooth completion of the natural gas pipeline relocation project for the widening and reconstruction (section a) of the fuquan expressway connection line!
2024
06-12
When the cold wind in autumn rolls up the flying sand, the construction site in Pingyuan County is still a busy scene. The roar of machinery and the shouts of the team members are intertwined, which is very lively.
2024
06-12
On November 22, 2023, after all the project personnel fought round the clock, the four-seal relocation project of the 559 Tangyan double-line crude oil pipeline (Beijing Daxing Airport Airport Airport Airport Airport Airport Economic Zone) of the Tianjin Oil Transmission Office of the National Pipeline Network was successfully put into operation!
2024
06-12
On November 22, 2023, in a lively scene, the directional drilling project of the three rivers of the Yanzi pipeline in Yantai port, Shandong port (Limin river, Bailang river and Xuanhe crude oil pipeline ∅ 711 with pressure plugging project) was completed on schedule. This not only injects new vitality into the development of Shandong ports, but also provides a stable guarantee for the smooth flow of the domestic crude oil supply chain.
2024
06-12
Winter snow shrouded the earth, like countless silver butterflies fluttering fluttering. A touch of red swaying in the snow, like a plum blossom standing proudly, is particularly bright against the snow. Yanshan station, a vibrant scene. The renovation project of the receiving barrel of Yanshan Station of Tianjin Oil Transmission Department has been a complete success!
2024
06-12
Since 2022, Jinshiwan has undertaken the Dongying Oil Transmission Station relocation project and completed its supporting projects, contributing to the smooth relocation of the oil transmission station. Through hard work, Jinshiwan successfully completed the pipeline rerouting project of the Dongdong Pipeline into the station section, the East-Huang double line into the station section, and the East-Lin double line out of the station section. This is a major recognition of the professional team of Jinshiwan, and it is also a testimony of Jinshiwan's continuous pursuit of excellence!
2024
06-12